News
19.10.2013
The company Interphos shipped extraction apparatus for "Acron" JSC

During 2013 the company Interphos manufactured and shipped more than 200 units for the installation of extraction of rare earth elements for the "Acron" JSC. As part of the delivery 3 stage extractors, reactors and containers of different volumes.

21.09.2013
The company Interphos shipped new plastic gas flues for "PhosAgro" JSC

During the summer and autumn of 2013 it was designed, manufactured and shipped a plastic vacuum separating gas flue for the enterprise "PhosAgro-Cherepovets". For this area have been issued standard polypropylene gas flues and discharge line of phosphoric acid.

12.09.2013
New extractors for the separation of rare earth elements

The new model developed by the laboratory extractors summer of 2013. In August, 60 1 liter extractors have been shipped to customers.

11.08.2013
The company Interphos produced a new mixer of high molecular weight polyethylene for phosphate abrasive slurries

Designed and manufactured new mixer of high molecular weight polyethylene for phosphate abrasive slurries. Stirrers with bunk blades with a diameter of 1.65 meters, will be installed in the extractors phosphoric acid workshop of "Dagfos" JSC.

27.11.2011
Interphos Company has developed an investment Project for “Dagfos” JSC

Design and construction

List of works on creation of new production

1. Preparation and research work.

1.1. Conduction of technical audit of existing production, with further recommendations to modernize equipment and improvement of industrial processes.

1.2. Conduction of laboratory research of the new technologies.

2. Financial, economic and marketing analysis of production process.

2.1. Preparation of a feasibility study (FS).

2.2. Preparation of business plan of the investment project.

2.3. Determination of long-term strategy for the enterprise.

3. Development of design documentation and specifications for new production.

3.1. Determination of parameters for main technological equipment.

3.2. Issuance of initial data for design.

3.3. Development of design documentation.

3.4. Development of reference design and specifications.

4. Equipment manufacture and supply.

4.1. Selection of the main technological equipment.

4.2. Determination of equipment manufacturers

4.3. Supply of equipment.

5. Installation and commissioning.

5.1. Installation and piping of the process equipment, power supply system, water supply, ventilation etc.

5.2. Pre-starting preparation of production.

5.3. Startup and final adjustments of production

6. Technical support of production.

6.1. Patenting of technology and licensing of production.

6.2. Field supervision over the adherence to the technological process.

6.3. Drawing up technological schedule of production.

6.4. Preparation of the instructions for engineers and maintenance personnel.